The Passenger Body
These bodies are based on some old ones the club have been using, again life is too short to reinvent the wheel every time you do something that works OK. We did some improvements like add some foot rest for the kiddie winks so they have somewhere for there feet to rest on.
There are 2 steel pressing and 2 buffer end plates with some steel tube which is all welded together. They are welded by a welding /fabrications company and then they go away for powder coating black, in our case. Then they have all the air tube and electrics fitted by Garry and they we all deliver as shown in the photos
As supplied from Garry All on site awaiting bogies and seats.
With it on the track with bogies under it. Sorry about the dirt on the truck
top.
This is how we are holding the seat part on to the carriage 2 Stainless steel
clips each end and a "R" pin to stop the been unclipped. To the right of the
first left hand clip is the air union for the brakes. next is the tow coupling.
Then the electrical socket. You can see 2 more square hole below the towing
coupling one of these is for 5" gauge locomotive to couple up to these trucks.
This is how it all fit together with a air line pipe and link to tow the next
carriage
Return to New Passenger Carriages page